Converting Municipal Solid Waste into Energy, Resources and Revenue
Building cleaner cities through sustainable waste management. No landfilling. No mass incineration. Zero residue processing.
Instead of seeing waste as a problem, we see it as an opportunity to create value.
MSW, legacy waste, RDF received at facility
Metals separated and recyclable materials recovered
Torrefaction at 250-300°C in controlled oxygen environment
Green charcoal, pellets, construction materials
© 2026 Indian Market Intelligence (IMI). Zero Residue Green Torrefaction Technology.
From 10 TPD pilot-scale to 400+ TPD municipal-scale projects.
| Parameter | WTE (Traditional) | Green Torrefaction (IMI) |
|---|---|---|
| Capacity | 700 TPD | 700 TPD |
| Capital Cost | ₹300 Cr | ₹200 Cr |
| Land Area | 20 acres | 4 acres |
| Environmental Clearance | Required | Not required |
| Construction Period | 48 months | 6 months |
| Residue After Process | Landfill required | Zero residue |
| Preprocessing Required | Yes | Not required |
| Plant Availability | <80% | 90% |
Scalability demonstrated: 10 TPD → 400 TPD • 7 lines operational • 9 lines under construction
Total pipeline: 4,300+ TPD capacity under construction including NTPC projects.
The Varanasi Harit Koyla Pariyojna (600 TPD MSW-to-Charcoal plant) was dedicated by Hon'ble PM Shri Narendra Modi on 23 February 2024.
| Parameter | Details |
|---|---|
| Project | Varanasi Harit Koyla Pariyojna |
| Capacity | 600 TPD → 200 TPD charcoal output |
| Operator | NVVN (NTPC subsidiary) |
| Location | Ramna, Varanasi (Uttar Pradesh) |
| Technology | Zero Residue Torrefaction |
| Dedication | 23 Feb 2024 by Hon'ble PM |
First reactor trial success: 200 tonnes of waste processed → 70 tonnes charcoal output.
IMI provides complete Engineering, Procurement, and Construction services.